ADC 16voies ETEP MOD268B Boards -------------------------------- Previous Update: 06/01/2003 A. Masserot Last Update: 23/01/2003 D. Verkindt Correspondance between board number and board VME address: VME address = A0100000 for board 1 VME address = A0200000 for board 2 ... VME address = A0F00000 for board 15 VME address = B0000000 for board 16 VME address = B0300000 for board 19 etc... =================================================================== =================================================================== A16V-01 17/09/1999 Frascati C34 test=OK 20/12/1999 Frascati internal quartz 12.00 MHz instead of 20.48 MHz 11/01/2001 Cascina C34 seems ok 06/02/2002 LAPP box Pb observed. Replaced by board 8 (SPARE) 13/01/2003 LAPP box test=all channels at 32767 24/05/2004 Cascina A16V-01 14/12/2004 LAPP-REPAIR All channels at -32767 - Problem due to an VBS interface inside the crate A16V-01 14/12/2004 CASCINA-C30 Laser Bench Slow Control =================================================================== A16V-02 17/09/1999 Cascina C25 test=OK DBench Slow Ctrl A16V-02 04/03/2003 CASCINA-C25 Detection Bench Slow Control A16V-02 14/12/2004 CASCINA-C30 Laser Bench Slow Control A16V-02 14/12/2004 CASCINA-SPARE =================================================================== A16V-03 17/09/1999 Cascina C25 test=OK DBench Slow Ctrl A16V-03 04/03/2003 CASCINA-C25 Detection Bench Slow Control =================================================================== A16V-04 17/09/1999 Cascina C39 test=OK Local Readout A16V-04 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring =================================================================== A16V-05 17/09/1999 Cascina C39 test=OK Local Readout 25/09/2001 LAPP box no Fbf possible in C39 when present 15/01/2002 LAPP box test=all channels at 32767 A16V-05 10/09/02 Cascina C75 North End Fast Frame Builder A16V-05 04/03/2003 CASCINA-C75 North End Fbf Monotoring =================================================================== A16V-06 07/09/1999 ETEP test=PB(32767) 26/10/1999 LAPP test=PB(32767) !!!!! 12/04/2000 LAPP test=PB(no digitization) 17/04/2000 ETEP pb fixed 08/06/2000 Cascina C39 test=OK <2001 LAPP box channels 1,2,15,16 give values > 32600 15/01/2002 LAPP box test=confirm problem on ch. 1,2,15,16 06/01/2003 LAPP box test=OK. Pb was a left-bottom switch bad config (SPARE) 13/01/2003 LAPP box test=OK 01/06/2004 LAPP test=OK A16V-06 14/12/2004 LAPP-REPAIR Problems with Interrupt generation =================================================================== A16V-07 17/09/1999 Cascina C39 test=OK Local Readout 21/02/2000 LAPP test=PB(32767) ?? 12/04/2000 LAPP test=PB(flip/flop not ok) 17/04/2000 ETEP (clock 12MHz->20.48MHz) 22/06/2000 LAPP test=board bot working 11/01/2002 LAPP Fbf/v5r4 gives always message "Lost Sample 0x2710 Lost Packet 2710" (0x2710=10000) 15/01/2002 LAPP box test=ok for Fb=50Hz, pb for Fb=10Hz (SPARE) 13/01/2003 LAPP box test=OK 01/2004 ETEP sent for reparation 04/2004 LAPP box test @10Hz KO - must be sent again =================================================================== A16V-08 07/09/1999 ETEP test=PB(32767) 26/10/1999 LAPP C85 test=OK 21/02/2000 LAPP C85 test=PB(32767) ?? 27/03/2000 LAPP test=OK 25/09/2001 Cascina Spare 06/02/2002 Cascina C34 replace board 1 A16V-08 04/03/2003 CASCINA-C34 Central Building Alignment Readout 01/06/2004 LAPP test KO (no VME reading) ETEP =================================================================== A16V-09 17/09/1999 Cascina C25 test=OK DBench Slow Ctrl A16V-09 04/03/2003 CASCINA-C25 Detection Bench Slow Control =================================================================== A16V-10 17/09/1999 Cascina C61 test=OK A16V-10 04/03/2003 CASCINA-C61 Mode Cleaner Fbf Monotoring =================================================================== A16V-11 17/09/1999 LAPP C37 test=OK 07/03/2000 Cascina C42 temp. Lr for Susp. 11/01/2002 Cascina C37 A16V-11 04/03/2003 CASCINA-C37 Calibration =================================================================== A16V-12 17/09/1999 Cascina C39 test=OK Env.Moni 08/06/2000 Cascina C39 Pb de spikes? A16V-12 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring =================================================================== A16V-13 17/09/1999 LAPP C85 test=OK 07/03/2000 Cascina C39 Local Readout 18/07/2000 LAPP lapprio6 Pb de spikes... vus sur C39 15/01/2002 LAPP lapprio6 test=ok (no more spikes!??), used by CaRT 06/01/2003 Cascina C72 Quadrant Readout 06/01/2003 Cascina C85 WE Adc Fast Frame Builder A16V-13 04/03/2003 CASCINA-C85 West End Fbf Monotoring =================================================================== A16V-14 17/09/1999 LAPP C16 test=OK 28/10/1999 LAPP test=OK 12/04/2000 LAPP test=PB(no PPL out) 17/04/2000 ETEP pb fixed 08/06/2000 Cascina C82 test=OK A16V-14 04/03/2003 CASCINA-C82 West End Quadrant Readout & Photodiode Slow Control =================================================================== A16V-15 17/09/1999 Frascati C34 test=OK 08/12/1999 LAPP channels 13 broken. 27/03/2000 ETEP back to ETEP ??/??/2000 LAPP lapprio6 back to LAPP 15/01/2002 Cascina C34 test=ok A16V-15 04/03/2003 CASCINA-C34 Central Building Alignment Readout 01/06/2004 LAPP test=ok A16V-15 08/06/2004 CASCINA-C34 Central Building Alignment Readout =================================================================== A16V-16 07/09/1999 ETEP test=PB(32767) 26/10/1999 LAPP test=PB(32767) !!!!! 12/04/2000 LAPP test=PB(no digitization) 17/04/2000 ETEP pb fixed 08/06/2000 Cascina C25 test=OK A16V-16 04/03/2003 CASCINA-C25 Detection Bench Slow Control =================================================================== A16V-17 17/09/1999 LAPP test=OK 27/03/2000 LAPP C72 test=OK 08/06/2000 Cascina C72 WE control (D7) A16V-17 04/03/2003 CASCINA-C72 North End Quadrant Readout & Photodiode Slow Control =================================================================== A16V-18 07/09/1999 ETEP test=PB(32767) 26/10/1999 LAPP C72 test=OK. 08/06/2000 Cascina C72 WE control (D7) A16V-18 04/03/2003 CASCINA-C72 North End Quadrant Readout & Photodiode Slow Control =================================================================== A16V-19 07/09/1999 ETEP test=ch.2 saturate 07/09/1999 LAPP test=OK 27/03/2000 LAPP C75 Local Readout WE 25/09/2001 Cascina C39 replace board 5 A16V-19 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring =================================================================== A16V-20 07/09/1999 ETEP test=ch.6 div. by 2 21/10/1999 Frascati C34 test=OK 08/12/1999 LAPP ch. 1 and 2 wired. 27/03/2000 ETEP back to ETEP. ??/??/2000 LAPP lapprio6 back to LAPP 15/01/2002 Cascina C34 test=ok A16V-20 04/03/2003 CASCINA-C34 Central Building Alignment Readout 01/06/2004 LAPP test OK (crate 34 KO) A16V-20 08/06/2004 CASCINA-C34 Central Building Alignment Readout =================================================================== A16V-21 19/07/2000 Cascina C39 test=OK A16V-21 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring =================================================================== A16V-22 19/07/2000 Cascina C39 test=OK 11/01/2002 LAPP box some channels have bad values (SPARE) 13/01/2003 LAPP box test=all channels at 32767 01/2004 ETEP box sent for reparation 01/06/2004 LAPP box test=OK A16V-22 08/06/2004 CASCINA-C34 Central Building Alignment Readout =================================================================== A16V-23 19/07/2000 Cascina C82 test=OK A16V-23 04/03/2003 CASCINA-C82 West End Quadrant Readout & Photodiode Slow Control =================================================================== A16V-24 19/07/2000 Cascina Spare test=OK ??/2001 Cascina C39 replace board 13 A16V-24 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring =================================================================== A16V-25 19/07/2000 Cascina test=OK 17/11/2000 LAPP 25/09/2001 Cascina C39 replace board 22 =================================================================== A16V-27 04/03/2003 CASCINA-C39 Central Building Fbf Monotoring ---------------------------------------------------------------- Local Readout Mode Cleaner 1 West End 1 (+1 ?) North End 1 (+1 ?) Central Building 6 ---------------------------------------------------------------- Quadrant Readout West End 1 North End 1 Central Building 3 ---------------------------------------------------------------- Det.Bench West End 1 North End 1 Central Building 4 ---------------------------------------------------------------- TOTAL: 20 (+2 ?) + 3 spares = 25 ---------------------------------------------------------------- ETEP: tel: 04.94.08.50.26 fax:04.94.08.28.03 email: etep@pacwan.fr Mr Eusebie, Mr Caille.